Natural Stone paint

Natural TrueMineral varnish Construction Technology

1: construction equipment and requirements: (1); Air Compressor: power five more than sufficient volume, at least with three trachea and can meet the simultaneous construction of three or more. (2); under the spray gun pot: Capacity 500ml, diameter more than 1.3mm, capacity should not too much, or too inconvenient to operate, while the construction of small-diameter slow period possible delay, not a large area of construction. (3); reallyMineral varnish spray: a single sub-guns,Dual pistols , three guns and so on, according to different monochromatic color selection using a single gun, two-color, multicolor withDual pistols , three guns, in order to adapt to different construction technology, emitting better results. (4); a variety of nozzle diameter: 4mm, 5mm, 6mm, 8mm, etc., in accordance with the requirements of a model for selection of different nozzles, the spray effect of the smaller caliber formation more uniform, large-caliber then spend the greater the stronger the sense of convex and concave.
2: Construction of flow: 12 hours 24 hours after grinding twiceBottom oil spray - spray reallyMineral varnish 2-3mm - Noodles oil spray twice
3: Construction Specifications: UV, radiation, water-based, additives, pigments (1); SprayingBottom oil : selection of the next pot spray gun, pressure 4-7Kg / cm2, the construction of the temperature should not below 10 degrees Celsius, spraying twice, interval 2; hours, the thickness of about 30 microns, dry ambient temperature 12 hours. (2) spraying really Mineral varnish : choose reallyMineral varnish spray gun, air pressure control at 4-7 kg / cm2, the construction of temperature above 10 degrees Celsius, the thickness of about 2-3mm, For applying two, three, then two hours interval , dry 24 hours before grinding. (3); polished: A 400 - 600 heads of sandpaper and gently really smooth convex surface of the sandMineral varnish can. Attention can not be too hard Meng, otherwise they will damage the paint film, causing the bottom of loose adhesion will cause serious adverse reallyMineral varnish off. (4); Spray noodle oil: choice of pot under the gun, the pressure of 4-7 kg / cm2, the construction of not less than 10 degrees Celsius, spraying twice, interval 2 hours, the thickness of about 30 microns, to be completely dry for 7 days.
4: Construction of the base and demands: for the external walls of concrete or cement and brick walls, have asbestos-cement board, wood, gypsum board, polyurethane foam board substrate. Construction of the substrate surface of the grass-roots level should be smooth and clean, and has good strength, the new wall should work one month before construction, renovation of the old wall, first leveling the grass-roots level, to remove loose, peeling off the surface and dust grease, etc. impurities before construction. Object for different spray coating technology Mineral varnish really one brick-shapedMineral varnish true: according to their well designed brick-shaped size, then painted in the wallBottom oil better framework for doing a good job with wooden brick-shaped model, in spray Mineral varnish , AtMineral varnish really do not yet form before the frame can be removed.